Title

Consider a resolution authorizing the Mayor to execute the Quantity Adjustment/Change Order No. 4 with Jordan Foster Construction, LLC for the Kenney Fort Boulevard - Segment 4C Project.

 

Body

Quantity Adjustment/Change order (QA/CO) No. 1 included removal of metal beam guard fence, provide portable concrete traffic barriers, and temporary pavement markings for the work at Joe DiMaggio Boulevard and Chandler Creek.  Steel encasement pipe was added for the waterline at the new driveway location and the bore for the waterline was extended due to the depth and the close proximity to the proposed NB bridge.  This Change Order/Quantity Adjustment is in the amount of $71,028.45.

 

QA/CO No. 2 was for the repair and relocation of the reuse water line, additional inlets behind the sidewalk to aid in the drainage near the residential area, including temporary signal at the intersection of Joe DiMaggio and Kenney Fort Blvd., bores under some driveways and additional Type B pavement.  This change order was in the amount of $160,469.05.  The Quantity Adjustment was in the amount of a negative $5,636.00.  The grand total of this QA/CO was $154,833.05.

 

QA/CO No. 3 was for the removal of two fire hydrants, the installation of a concrete flume on the backside of the sidewalk, removal of pavement markings, install additional raised pavement markings, modifications to the traffic signals at Joe DiMaggio Boulevard and Old Settlers Boulevard, and removal of one tree that fell in the roadway during a storm.  The quantity adjustments were mainly roadway excavation overruns due to incorrect Engineer calculations of the original plan quantity. The Change Order portion was $74,261.65.  The Quantity Adjustments are $303,072.00.  The total amount was for $377,333.65.

 

QA/CO No. 4 is the final Change Order and Quantity Adjustment for the project.  Many of these items were late coming in after the project was finished.  Additional concrete median work with the stamped and dyed concrete, additional concrete sidewalk that was damaged when the waterline was being constructed, an additional right turn lane was added so an additional driveway curb and gutter and asphalt were needed.  Additional manholes were also added, an additional curb ramp was added to bring it up to current standards, and additional pavement markings that were missed on the original plans.  The Change Order portion is $289,856.68.  Quantity Adjustments were $269,848.67.  The total amount of QA/CO No. 4 is $559,705.35.

 

 

Cost: $559,705.35

Source of Funds: RR Transportation and Economic Development Corporation