Title

Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 4 with K. Friese & Associates, Inc. for the Kenney Fort Boulevard Extension Project.

 

Body

Kenney Fort Boulevard is a major arterial roadway shown on the Transportation Master Plan to eventually connect from the City of Georgetown across the City of Round Rock and continue to the City of Pflugerville. The first segment of Kenney Fort Boulevard between Joe DiMaggio Boulevard and Forest Creek Drive was completed during the summer of 2013. Future planning for the southern and northern sections of Kenney Fort Boulevard are ongoing. City Staff has been mindful of the future right-of-way needs for this roadway as development progresses and the City plans for future growth.

 

The original contract with K Friese & Associates prepared a preliminary roadway schematic and identified the additional required right-of-way corridor location and configuration of Kenney Fort Boulevard from US 79 to Old Settlers Boulevard. The amount of the contract was $450,961.00

 

Supplemental Contract No. 1 with K Friese & Associates provided Plans, Specifications, and Construction Phase Services for a 24-inch water transmission main to be constructed along Kenney Fort Boulevard from Old Settlers Boulevard to Chandler Creek Blvd. Supplemental Agreement No. 1 was for $79,745.

 

Supplement Agreement #2 allows for the development of 3 separate PS&E packages to allow for the completion of this segment of roadway in multiple phases. Segment 4A, Segment 4B and Segment 4C as described in the Exhibit B document. The final result will be a 6-lane divided arterial section from Joe DiMaggio Blvd to Old Settlers Blvd.

No. 2 was for $505,778.00

 

Supplemental Agreement No. 3 with K Friese & Associates increased the overall length of the proposed 24-inch waterline that will be constructed with the Kenney Fort Boulevard North Extension project. The increased waterline length allows the waterline to be aligned with the proposed project shown in the City's 2020 Water Masterplan update. The change required additional waterline design and subsurface utility investigations at two locations. Supplemental Agreement No. 3 was for $34,206.

 

Supplemental Agreement No. 4 with K Friese & Associates is for additional waterline design and the surveying to acquire two parcels to enable the construction of the roadway.  The amount for the additional services is $87,967.  Utilities portion is in the amount of $ 29,005.00.  The remainder is for Surveying in the amount of $58,962.00 and that is a Transportation cost.

 

 

Cost: $87,967.00

Source of Funds: RR Transportation and Economic Development Corporation, Self-Financed Water Construction