Round Rock Texas Banner
File #: 2019-0324   
Type: Resolution Status: Approved
File created: 7/22/2019 In control: City Council
On agenda: 8/8/2019 Final action: 8/8/2019
Title: Consider a resolution authorizing the Mayor to execute a Contract for Engineering Services with CAS Consulting & Services, Inc. for the South Interceptor Manhole Rehabilitation Project.
Indexes: Self-Financed Wastewater Construction
Attachments: 1. Resolution, 2. Exhibit A, 3. Map, 4. Form 1295

Title

Consider a resolution authorizing the Mayor to execute a Contract for Engineering Services with CAS Consulting & Services, Inc. for the South Interceptor Manhole Rehabilitation Project.

 

Body

The South Wastewater Interceptor was installed in 1984 and is co-owned by the City of Round Rock (55.95%) and the City of Austin (44.05%). Recent inspections of the South Wastewater Interceptor have indicated deteriorating conditions of the manholes located along the entire length of the wastewater line. Deteriorating manholes can lead to infiltration of water into the wastewater line, and if left untreated, the failure of the manhole.

This item is for professional engineering services related to the evaluation, design and construction phase services needed to rehabilitate the manholes along the South Wastewater Interceptor. This project will consist of the extensive rehabilitation of 61 manholes which will restore the complete service life of the manhole.

The total engineering contract value is $87,680.00. The City of Round Rock and City of Austin will each pay their associated share of the project based on their percentage ownership in the wastewater line. The City of Round Rock’s share of the total cost will be $49,056.96. This project will be managed by the City of Round Rock.

Staff recommends approval of this contract.

 

Cost: $87,680.00

Source of Funds: Self-Financed Wastewater Construction