File #: 2024-126   
Type: Resolution Status: Agenda Ready
File created: 5/6/2024 In control: City Council
On agenda: 5/23/2024 Final action: 5/23/2024
Title: Consider a resolution authorizing the Mayor to execute a Standard Form of Agreement between Owner and Architect with Jacobs Engineering Group Inc. for the Bob Bennett Complex Phases II, III, and IV Project.
Indexes: General Self-Financed Construction
Attachments: 1. Resolution, 2. Exhibit A

Title

Consider a resolution authorizing the Mayor to execute a Standard Form of Agreement between Owner and Architect with Jacobs Engineering Group Inc. for the Bob Bennett Complex Phases II, III, and IV Project.

 

Body

The City of Round Rock along with Jacobs developed a Master Plan of Utilities, Transportation and General Service to be located out at Luther Peterson which will eventually become the Bob Bennett Complex. This will be a single campus that contains Administrative Office and Departmental Shop functions for Utility and Environmental Engineering, Transportation, and General Services Fleet Maintenance departments. The Master Plan envisioned a 20-year growth plan accomplished in three phases. Phase I of the Master Plan was completed in 2019 and included all functions for the Utility and Environmental group and the engineering services for transportation. 

 

This resolution is for an Architectural Agreement with Jacobs Engineering Group Inc. for architectural, structural, mechanical, electrical, plumbing, and civil engineering services for additional phases II, III, and IV of the Bob Bennett Complex include programming, design, cost estimating, commissioning, and construction administration. This scope of services will review and update the masterplan to verify all groups and functions are accommodated.  The Master Plan will address City needs beyond the original 2035 long term goals as the cities growth rates have exceeded the original master plan goals.  This planning date will be determined during the masterplan update.  From this Master Plan phases II, III and IV will be designed and built over the following years to eventually complete the full Bob Bennett Complex (BBC). 

 

As the original architectural firm for the Bob Bennett Phase I, Jacobs Engineering Group is recommended as a direct select professional service.

 

Cost: $5,693,500.00

Source of Funds: General Self Financed Construction