Consider a resolution authorizing the Mayor to execute a contract with Gage and Cade Construction, LLC for the South Creek Channel Improvements Project.
Body
On February 24, 2022, the City executed an Engineering services contract with Kasberg, Patrick, & Associates. This contract was to design improvements for an eroded channel bank encroaching into properties with existing structures.
The design includes installation of rock riprap with filter fabric, limestone blocks, 1” rock backfill and gabion mattress to stabilize the channel bank. Along with the incidentals of excavation, embankment, dewatering, and revegetation.
On April 30, 2025, the City received seven bids for the construction of the designed improvements. The City is recommending contracting with Gage and Cade Construction for the execution of a construction contract for the South Creek Channel Improvements Project for a total contract award of $327,991.40. The engineer’s construction estimate for the Base Bid was $320,132.
Cost: $327,991.40