Skip to main content
Round Rock Texas Banner
File #: 2025-143   
Type: Resolution Status: Agenda Ready
File created: 5/14/2025 In control: City Council
On agenda: 6/12/2025 Final action:
Title: Consider a resolution authorizing the Mayor to execute a contract with Gage and Cade Construction, LLC for the South Creek Channel Improvements Project.
Indexes: Self-Financed Stormwater Construction
Attachments: 1. Resolution, 2. MAP, 3. BID TAB, 4. AWARD, 5. 1295
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Consider a resolution authorizing the Mayor to execute a contract with Gage and Cade Construction, LLC for the South Creek Channel Improvements Project.

 

Body

On February 24, 2022, the City executed an Engineering services contract with Kasberg, Patrick, & Associates. This contract was to design improvements for an eroded channel bank encroaching into properties with existing structures.

 

The design includes installation of rock riprap with filter fabric, limestone blocks, 1” rock backfill and gabion mattress to stabilize the channel bank. Along with the incidentals of excavation, embankment, dewatering, and revegetation. 

 

On April 30, 2025, the City received seven bids for the construction of the designed improvements.  The City is recommending contracting with Gage and Cade Construction for the execution of a construction contract for the South Creek Channel Improvements Project for a total contract award of $327,991.40. The engineer’s construction estimate for the Base Bid was $320,132. ​

 

Cost: $327,991.40

Source of Funds: Self-Financed Stormwater Construction