Consider a resolution authorizing a reimbursement to Avery Centre DevCo., Inc. for the cost of oversizing a reuse water line for the Avery Nelson Parkway - Reclaim Water Extension Project.
Body
In preparation of developments, Avery-Nelson Parkway is being extended from its current location east of A.W Grimes Boulevard further east by 1,235 feet. The developer wanted to provide reuse water to the property with a 2-inch line. The City desires to extend the reuse water system with an 8-inch reuse waterline to provide reuse water to serve future developments and to extend its reuse water system. The City will pay to oversize the 1,235 linear feet of a 2-inch line to an 8-inch line at the rate of $2.60 per inch of oversize per linear foot of pipe, or a total of $19,266.
Cost: $19,266.00
Source of Funds: Oversize Utility Lines