Title
Consider a resolution authorizing the Mayor to execute a Contract with DigDug Construction, LLC for the Old Settlers Park Concrete Repair 2025 Project.
Body
This item will authorize the City Manager to enter into an agreement with DigDug Construction LLC for the Old Settlers Park Concrete Repair Project. A total of six (6) bids were received for this project with DigDug Construction being the lowest bidder. PARD has worked with DigDug Construction in the past and has completed several successful projects with their team.
This project includes replacing damaged portions of concrete or walkways/plazas that have fallen out of ADA compliance. The soils at Old Settlers Park are heavy clay soils, and as such, the ground shifts and heaves during freeze/thaw cycles and after heavy rains. As a result, portions of the walkways have shifted such that they are no longer ADA compliant or are safety/tripping hazards. This project will replace concrete walkways and plazas at the Soccer, Hall of Fame, Silver Slugger, and Gold Glove Complexes, as well as the trail that connects all baseball/softball complexes.
Cost: $217,335.00
Source of Funds: General Self-Financed Construction