File #: 2022-165   
Type: Resolution Status: Approved
File created: 4/25/2022 In control: City Council
On agenda: 5/12/2022 Final action: 5/12/2022
Title: Consider a resolution authorizing the Mayor to execute a Contract with Prota, Inc. for the Water Treatment Plant Pressure Control Valves Project.
Indexes: Self-Financed Water Construction
Attachments: 1. Resolution, 2. Award Letter, 3. Bid Tab, 4. MAP, 5. Form 1295

Title

Consider a resolution authorizing the Mayor to execute a Contract with Prota, Inc. for the Water Treatment Plant Pressure Control Valves Project.

 

Body

This agenda item is for the construction contract for the addition of two pressure relief valves, vaults, and associated piping, to the City of Round Rock Water Treatment Plant. Round Rock Utility Staff previously selected CDM Smith, Inc. to design the project. 

 

To provide adequate pressure and accommodate the water distribution system when Barton Hill Elevated Storage Tank, a 2.7-million gallon structure, is taken offline for recoating, CDM proposed the addition of a pressure relief valve to the Water Treatment Plant. A second pressure relief valve is included in the project to assist the City during an emergency by moving BCRUA water into the eastern portion of the City.

 

The Utilities and Environmental Services Department opened bids on March 10, 2022, with only one bidder submitting a bid.  Prota, Inc. bid the total construction cost at $1,598,867.

 

Cost: $1,598,867

Source of Funds: Self-Financed Water Construction