Round Rock Texas Banner
File #: 2016-3752   
Type: Resolution Status: Passed
File created: 8/22/2016 In control: City Council
On agenda: 9/8/2016 Final action: 9/8/2016
Title: Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 2 with Atkins North America, Inc. for the E. Bagdad Avenue Extension Project.
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: 1. Resolution, 2. Exhibit A, 3. Form 1295
Title
Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 2 with Atkins North America, Inc. for the E. Bagdad Avenue Extension Project.

Body
The Original Contract with Atkins North America, Inc. in the amount of $104,700.41 consisted of preparing survey, environmental tech memo, and 30% PS&E for the E. Bagdad Ave Extension. The project initially included a new location 2-lane divided roadway connection between Burnet St. and S. Black St. as well as improvements to S. Georgetown St. between S. Black St. and E. Main St. The approximate length of the initial project was 0.33 miles.

Supplemental #1, in the amount of $326,360.94, consisted of preparation of 60%, 95% and 100% PS&E plans for the project as well as survey, environmental tech memo and pavement design. The proposed improvements to the project included a new location 3-lane roadway connection between Burnet St. and S. Black St. as well as the widening of S. Georgetown St. to 3-lanes between S. Black St. and E. Main St. Also, existing E. Bagdad Ave between McNeil Rd. and Burnet St. was relocated directly adjacent to the railroad as a 3-lane section. The approximate length of the project, including additions, was increased to 0.54 miles, bringing the new contract amount to $431,061.35.

Supplemental #2 will amend the agreement to include the addition of water quality and landscaping, as well as the extensions of Lampasas St. and Sheppard St. to the project. Compensation for this amendment will increase by $85,675.85, which will bring the total contract cost to $516,737.20 for the project.

The Transportation Department recommends that the City of Round Rock execute a supplemental contract with the engineering firm Atkins North America, Inc. in the amount of $85,675.85 in exchange for providing the City of Round Rock with additional water quality, landscaping and PS&E plans for Lampasas St. and Sheppard St., as part of the E. Bagdad Ave Extension project.

Cost
$85,678.8...

Click here for full text