Round Rock Texas Banner
File #: 2017-4492   
Type: Resolution Status: Approved
File created: 5/22/2017 In control: City Council
On agenda: 6/8/2017 Final action: 6/8/2017
Title: Consider a resolution authorizing the Mayor to execute a Development Agreement with United Parcel Service regarding the construction of certain roadway and waterline improvements servicing the Roundville Lane Development.
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: 1. Resolution, 2. Exhibit A, 3. Form 1295
Title
Consider a resolution authorizing the Mayor to execute a Development Agreement with United Parcel Service regarding the construction of certain roadway and waterline improvements servicing the Roundville Lane Development.

Body
For the purposes of the Development Agreement between the CORR and UPS, the “Road Project” shall be comprised of both the “UPS Road Project” and the “Roundville Lane Project”. The “UPS Road Project” shall be the (i) new construction of approximately eight hundred and twenty (820) linear feet of Roundville Lane, as depicted in Exhibit “B”, attached hereto, which consists of the construction of a thirty-six (36) foot (measured face-of-curb to face-of-curb), three lane concrete roadway from existing Roundville Lane to the access road of SH 45, (ii) the design and construction of two (2) right turn deceleration lanes (“Deceleration Lanes”) along northbound A.W. Grimes Blvd. at Roundville Lane and along the eastbound SH 45 frontage road at the proposed Roundville Lane intersection, (iii) a traffic signal, as described in Section 6.C., below, (iv) the design and construction of a waterline within Roundville Lane, as described in Section 6.D. and 6.E., (v) the design and construction of a wastewater line as described in Section 6.F, and (vi) stormwater mitigation as described in Section 6.G, all as shown on Exhibit “B”.

The “Roundville Lane Project” shall be the (i) re-construction of approximately two thousand (2,000) linear feet of the existing Roundville Lane, including stormwater mitigation, which is shown in red on Exhibit “B”, (ii) the design and construction of a waterline within Roundville Lane, as described in Section 6.D. and 6.E., and (iii) the design and construction of a wastewater line as described in Section 6.F.

Points of Interest:
City Participation-
A. The City shall be wholly responsible for the design and construction of the Roundville Lane Project and the UPS Road Project.
B. City shall (i) design and engineer t...

Click here for full text