File #: 2018-5699   
Type: Resolution Status: Approved
File created: 7/19/2018 In control: City Council
On agenda: 8/9/2018 Final action: 8/9/2018
Title: Consider a resolution authorizing the Mayor to execute a Contract for Engineering Services with Kimley-Horn and Associates, Inc. for the Lake Creek 10 & Lake Creek 11 Wastewater Improvements Project.
Indexes: Self-Financed Wastewater Construction
Attachments: 1. Resolution, 2. Exhibit A, 3. Form 1295, 4. Map

Title

Consider a resolution authorizing the Mayor to execute a Contract for Engineering Services with Kimley-Horn and Associates, Inc. for the Lake Creek 10 & Lake Creek 11 Wastewater Improvements Project.

 

Body

In the City’s Wastewater Master Plan, the plan identified two sections within the wastewater collection system known as the Lake Creek 10 and Lake Creek 11 wastewater lines, which will need to be upsized in order to meet the capacity requirements for these lines at buildout. The construction of a few higher density developments have resulted in the need to upsize these sections of wastewater lines at this time, instead of at a later date. The Lake Creek 10 wastewater line improvements will upsize approximately 1,400 linear feet of existing 10-inch wastewater line to 12-inches in diameter and Lake Creek 11 wastewater line improvements will upsize approximately 2,700 LF of existing 8-inch wastewater line to 10-inches in diameter.

This item for professional engineering services will fund design, bidding, and construction phase services to upsize these lines.  Staff recommends Kimley-Horn and Associates, Inc., to perform the engineering services for this project.

Cost: $87,500

Source of Funds: Self-Financed Wastewater Construction