Title
Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 2 with HDR Engineering, Inc. for the CR 112 from CR 117 to CR 110 Project.
Body
On January 9, 2023 the City Council approved a contract with HDR Engineering, Inc. for the preliminary schematic design of CR 112 (Avery Nelson Parkway) from CR117 to CR110 in the amount of $468,491.63.
Supplemental Agreement No. 1 was for the roadway improvements for CR 112 (Avery Nelson Parkway) from CR 110 to CR 117 to widen this 1.20-mile section from a two-lane roadway to six-lane divided roadway and add pedestrian facilities per the approved schematic. The work to be performed by HDR Engineering, Inc. consisted of providing engineering services for ROW survey, utility coordination, roadway, drainage, signing, pavement markings, and illumination at 60%, 90% and the Final Plans, Specifications, and Estimate (PS&E) submittals.
This Supplemental Agreement No. 2 is for providing engineering services to prepare traffic signal plans at CR 110 intersection, CR 112 (Avery Nelson Parkway) and Kenney Fort Boulevard intersection coordination and design changes for the Ponce De Leon street connection. This supplemental is also to modify the tie-in phasing with the CR-112 (Avery Nelson Parkway) West Segment. The proposed cost for this supplemental is $154,324.00. This will bring the total contract amount to $1,264,442.52.
Cost: $154,324.00
Source of Funds: RR Transportation and Economic Development Corporation